Welcome to the letter of the official website

SHENZHEN SITEMPO TECHNOLOGY CO., LTD.

International quality of excellencePrecision metal products suppliers

Service Hotline0755-28054033

FAQ

Recommended Products

Contact Us

National Hotline:0755-28054033

Company name: SHENZHEN SITEMPO TECHNOLOGY CO., LTD.
Phone: 0755-2805 4033 / 2805 4233
Fax: 0755-2805 4133
Phone: 18038042403
Mail: sitempo@yeah.net
Address: Xunli Logistic Park, Fuqian Road 257, Guanlan Street, Longhua District, Shenzhen, Guangdong, China

What is the radiator extrusion process?

Article Source: SHENZHEN SITEMPO TECHNOLOGY CO., LTD.Popularity:245Issuing time:2017-08-10 10:59:59smallinBig

1, for high density teeth and tongue than the mold test mode, the first aluminum rod must be 150-200mm short aluminum rods or pure aluminum rods.

2, before the test mode, you must adjust the extrusion center, squeeze the shaft, Sheng Dong tube and die base outlet in a center line.

3
, in the test mode and the normal production process, aluminum rod heating temperature to ensure that between 480-520 ℃.

4, the mold heating temperature according to the conventional mold temperature, control at 480 ℃ or so, the diameter of 200mm below the flat mold holding time of not less than 2 hours, if the shunt mold insulation in more than 3 hours; diameter greater than 200mm above the mold insulation 4-6 Hour to ensure that the mold core temperature and external temperature uniformity.

5, in the test mode or before production, you must use a clear cylinder pad to clean up the drum barrel, and see whether the normal operation of the extruder empty.

Six, try or start production, the extruder automatically shut down, each switch to zero. From the minimum pressure began slowly from the pressure, the material about 3-5 minutes, the aluminum filling process to control the main pressure. Pressure control in the 100Kg / cm2 or less, the ammeter data within 2-3A, generally 80-120Kg / cm2 can be expected before, can be slowly accelerated, the normal production of extrusion pressure to less than 120 Kg / cm2 pressure.

7, mold in the test or production process, such as the discovery of blocking, partial teeth, such as the speed of deviation is too large to immediately stop, and point off the way unloading, to avoid die scrapped.

8, in the test mode or production process, the outlet must be smooth, pad or clamp material according to the expected reasonable grasp of the situation. At any time to observe the abnormal situation, timely processing, the downtime to immediately stop.

9, straightening process, we must carefully check before and after the change, the operation of norms, moderate force, strict product quality.

10, in accordance with the requirements of the production schedule reasonable length, sawing, the sawtooth feeding speed can not be too fast, to avoid injury to the end, the end must be clamped, remove the flash and burr.

11, loaded baskets to regulate, including the pad to be placed reasonable, to avoid damage profiles.

12, profile aging temperature control in the 190 ± 5 ℃, insulation 2.5-4 hours, baked after the air-cooled.